EQc3.2: Construction IAQ Management Plan (Before Occupancy)

The intent of this credit is to help mitigate the odors, fumes, dust, particulates, etc. that remain in the building once it is turned over to the new owner.   There are a few approaches to this method:

  • Flush out before occupancy but after construction:  Keep in mind the schedule impact when trying to go this route.  You need to have the building empty for quite a few days until you  push the required amount of air through it.
  • Flush out after occupancy:  Very similar, but you need to do this a little slower while it is occupied.  You also have to maintain a certain humidity and temperature, so your HVAC costs might be higher.
  • Air Quality Testing: Test the air in the building at specific locations for specific chemical compounds.  If the tests pass, you have basically achieved this credit.

There are no exemplary performance points available for this credit.