MRc2.2: Construction Waste Management
This is the same credit as MRc2.1, however the level of recycling is increased to 75% from 50%. Keep in mind that if you hit 95% recycling on the jobsite, you will be eligible for 3 points: MRc2.1, MRc2.2 and the exemplary performance ID credit.