MRc2.2: Construction Waste Management

This is the same credit as MRc2.1, however the level of recycling is increased to 75% from 50%.  Keep in mind that if you hit 95% recycling on the jobsite, you will be eligible for 3 points: MRc2.1, MRc2.2 and the exemplary performance ID credit.

Leave a Reply

You must be logged in to post a comment.