Same as MRc1.1, except increase the amount required from 75% to 95%.
This entry was posted
on Thursday, April 17th, 2008 at 1:57 pm and is filed under MR: Materials and Resources.
You can follow any responses to this entry through the RSS 2.0 feed.
You can leave a response, or trackback from your own site.